Spectra-precision Survey Pro v4.5 Ranger Reference Manual User Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 475
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
File Menu
R-9
Next > : opens the next screen. The screen that opens depends on if
a control file will be used.
Create a New Job 2 – (Imported or
External Control File)
This screen will only open next when a control
file will be used or imported.
Import Control Points: When selected, the
points in the control file will be imported into
the new job.
Use External Control File: When selected, the
control points in the control file will be
accessible from the new job, but will not be
imported.
Control File: displays the path and control file
name selected with the Browse… button.
Browse… : will open the Open screen (Page R-
13) where an existing job can be selected as a
control file.
< Back : returns you to the previous screen.
Next > : opens the next screen.
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 474 475

Comments to this Manuals

No comments