Spectra-precision Survey Pro v4.5 Recon and Nomad Reference Manual User Manual Page 281

  • Download
  • Add to my manuals
  • Print
  • Page
    / 469
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 280
Stakeout Menu
R-273
Turn Gun : (available with robotic total station) turns the total
station toward the design point.
< Back : returns to the second screen.
Stake Next > : returns you to the previous Stake Points screen where
the Design point is advanced by the Increment value.
Instrument Stakeout
Instrument Stakeout is a special stakeout option only available when
using a Nikon DTM or NPL series total station while the Send
Stakeout Data to Instrument option is checked in the Instrument
Settings screen.
When using Instrument Stakeout
, a new stakeout screen, shown
below, will appear after you tap Stake > from the Stake Points -
Screen Two, described above. The stakeout data is then sent to the
total station where the controls on the total station are
used to stake the point.
Once you are satisfied with the stake location, tap
Take Final Shot > to shoot the final stakeout location
and proceed to the Stake Points – Screen Three, as
described above.
If you tap Shot from Screen Three
to take another shot,
you will return to the Instrument Stakeout screen, where
you can once again use the controls on the total station to
stake the point.
HR: is the rod height.
Update HR on Instrument : If a new rod height is entered
in the HR field, or if a new Smart Target is selected, this
button sends the new HR information to the total station.
Take Final Shot > : Once you are satisfied with the stake location,
this button will take a final shot before proceeding to the next Stake
Point screen (Screen Three, described above).
Page view 280
1 2 ... 276 277 278 279 280 281 282 283 284 285 286 ... 468 469

Comments to this Manuals

No comments